Pro-Tec Equipment | Slide Rail Installation and Removal

Slide Rail Installation and Removal

Installation

1

After initial pilot cut, first outer panel and corner post are put into place.

slide-rail-installation-1

2

Second panel and corner post form a right angle.

slide-rail-installation-2

3

With outer panels and posts in position…

slide-rail-installation-3

4

excavation continues…

slide-rail-installation-4

5

while outer panels and corner posts are pushed to proper depth with excavator.

slide-rail-installation-5

6

Excavation is deepened and panels are lowered into inside tracks.

slide-rail-installation-6

7

Excavator continues to dig and push the inside panels and corner posts...

slide-rail-installation-7

8

until desired depth is reached.

slide-rail-installation-8

Removal

9

Extract inner panels as backfilling and compaction is started.

slide-rail-installation-9

10

Outer panels and corner posts are extracted as back filling and compaction is completed.

slide-rail-installation-10

Contact Pro-Tec

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Why Pro-Tec Equipment

why-pro-tec-location

Pro-Tec Equipment is designed with superior quality, safety, dependability and durability in mind. We have continued to expand our range of equipment and services to ensure you, our customer, have what you need to meet the constant challenges you face at the worksite. Your success is our success.

Learn More

Download Product Literature

Downloadable PDFs of our product lines.

Related Literature:
View All